Basic Introduction

 

 

Location:Samarkand, Uzbekistan
Brick size: 250*120*88mm
Brick output: 100,000 red bricks per day
Production line: JKZ90 double-stage vacuum extruder
Kiln design: 4.4m section tunnel kiln with one dryer and one burner
 